Clovis Canopies drew on its 45 years of craftsmanship expertise and experience to design, manufacture and install a stunning curved canopy at St Gregory’s Primary School in Ealing.
The project tasked Clovis with building a bespoke 170m2 canopy that would fit seamlessly to the school’s new curved extension, a testing technical challenge that was further complicated by the fact that the building was far from complete and only a limited number of drawings were available.
Once the precision design and manufacturing stages were complete, Clovis carried out the installation in just 10 days during term-time without disruption to the school.